I finished installing all the doors! Now I get to do five windows ... Wahoo. Then I need to do a lot of door and window trim ... Joy.
Sunday, October 28, 2012
Saturday, October 27, 2012
Playhouse - One To Go! (2012-061)
Here's the last door . It's kid sized, and I let Renee pick the color. She chose this shade of green, which makes me think of green Playdoh. It's a good color contrast with the rest of the dark wood stain I chose for the house.
Tuesday, October 9, 2012
Playhouse - Two Doors Down!... (2012-060)
... And one door to go! Well at least I got most of the work done for two doors, and I'm pretty happy with the progress I made today. I got the second adult sized door hung up (top picture) and installed the door handle in the right side door (bottom picture). I still need to install the threshold, side trim, and sliding bolts to hold the left side door. I feel the rainy season is fast approaching, so I plan to move on to the third door to close up the currently open door frame now. Then I will come back and finish the smaller door details.
Saturday, September 29, 2012
Thursday, September 27, 2012
Playhouse French Doors (2012-058)
Here I am toiling through the night on the first door. I stained the wood, cut and installed the window molding, installed the window acrylic, cut and installed more window molding, and caulked the seams. Next, I will need to install the hinges...
Thursday, September 20, 2012
Playhouse French Doors (2012-057)
I decided to switch from building the windows to building the doors, because they'll cover bigger openings to protect the house against rain. So here's step one: getting the wood cut, assembled, and glued ...
Subscribe to:
Posts (Atom)








