Playhouse - Two Doors Down!... (2012-060)

... And one door to go!  Well at least I got most of the work done for two doors, and I'm pretty happy with the progress I made today.  I got the second adult sized door hung up (top picture) and installed the door handle in the right side door (bottom picture).  I still need to install the threshold, side trim, and sliding bolts to hold the left side door.  I feel the rainy season is fast approaching, so I plan to move on to the third door to close up the currently open door frame now.  Then I will come back and finish the smaller door details.