Playhouse South Wall

This weekend was dominated by Renee's soccer tournament, which took away from my playhouse construction time.  I only had time to work a little on the north wall and put OSB plywood panels up on the south wall.  The sun goes down at 5:30 now, so I had to take this picture in the dark.


Sunday, November 6, 2011

Playhouse West to North

Today I cut the opening for the French doors in the west wall.  Of course, it took longer than I thought.  Then I got the OSB panels up for the north wall before it got really dark.  I still have to fully screw down the panels to the studs and cut out two window openings.  Thanks to day light savings time, the sun sets earlier now, so I will have virtually no sun light to work on the playhouse after work.



Saturday, November 5, 2011

Playhouse West Wall

Today I had just enough time to mount the plywood for the west wall before the rain set in.  I still have to cut out the big opening for the French doors.


Monday, October 31, 2011

The East Wall

I finally put up the OSB plywood on the east wall of the playhouse, and it really helps make the structure more stable and rigid.  I feel much more confident about my design and construction work now!  Of course I still have a lot more plywood panels to put up, but I won't be able to do it until after the next forecasted rain fall this coming Thursday.



Thursday, October 20, 2011

Dormer Modification

So I think the dormer roof looks better than the flat top roof.  I extended the dormer roof gable out to the east wall to make it simpler to build.  Before I modeled the change in my CAD, I thought it might look weird, but it looks acceptable.


Monday, October 17, 2011

Simpler Dormer Roof

Here's an idea I am considering for a simpler dormer roof to make it easier for me to build.