Sunday, May 19, 2013

Base Boards (2013-015)

I finally got the base boards installed around all the edges of the flooring.  It feels good to get rid of the shims and exposed underlayment around the edges.  Later I will need to caulk over a lot of gaps around the base boards and paint over my finishing nail heads.




Sunday, May 5, 2013

Flooring is Done!!! (2013-013)

The flooring is done from top to bottom!  I must say that it looks mighty nice when it's new and shiny.  Now the challenge is to keep it looking good.  So I now everyone must take off their shoes before entering!




Saturday, May 4, 2013

First Level Flooring Part 2 (2013-012)

I started installing the laminate flooring on the first level.  I'm really glad I was able to figure out how to install it without removing the ladder!  Fortunately, the Home Depot guy I talked to knew about pull saws, which was the perfect tool for trimming the bottom ends of the ladder without removing it!  Then there was enough flexibility in the ladder brackets that allowed me to lift the ladder up slightly so I could slip the underlayment and flooring underneath.


Monday, April 29, 2013

First Level Flooring (2013-011)

Today I started installing underlayment for the first floor.  I used more expensive underlayment, which is red. In addition to keeping out moisture and cushioning the "floating" floor panels, this underlayment is supposed to reduce noise as people walk on the floor.  We'll see if that's true.


Sunday, April 28, 2013

Loft Flooring Part 2 - (2013-010)

The laminate flooring is in the loft!  Later I will need to install base boards around the perimeter.


Saturday, April 27, 2013

Loft Flooring (2013-009)

Today I installed underlayment on the loft level in preparation for the flooring.