Thursday, June 7, 2012
Dormer Roof Window Trimmings (2012-041)
On Sunday, I added the thin plywood as siding for the small dormer walls (first two pictures). The acrylic I used for the windows is pretty thin. It's strong enough as along as no one pushes or hits the windows hard. But as an added precaution, I replaced the temporary railings I had before installing the windows with more nicely finished permanent railings (last picture).
Friday, June 1, 2012
Dormer Roof Window (2012-040)
The dormer roof window is up! I actually got it done last night, but I didn't take a picture until today. The dormer still has small portions of wall that I need to cover with some exterior material. Right now I just have felt paper for coverage. I will probably use thin plywood for the job. But my primary goal this weekend is to finally get siding from Home Depot.
Tuesday, May 29, 2012
Playhouse Stealth Mode (2012-039)
I finally got the felt paper up on all the walls, so it feels like the playhouse is in stealth mode ...
Sunday, May 27, 2012
Loft Gate (2012-038)
I got the new and improved loft gate finished yesterday, but I didn't take pictures of it until today. The previous gate was just temporary and pretty flimsy. I removed it over a month ago. This new gate is much more sturdy and the vertical elements follow the same construction as the rest of the loft railing. I opened up the playhouse for the kids to play in during our Memorial Day weekend barbecue, so I wanted to make sure I had the gate installed for their safety.
Tuesday, May 22, 2012
East Roof Window (2012-037)
I got the second "roof window" installed on the east wall. This one will require a little more thought than the west window, because the east window is adjacent to the dormer roof. So I want to make sure I keep things water tight.
Friday, May 18, 2012
Gettin' the Felt On (2012-036)
I didn't get as much done last week as I should have, so I am pulling out all the stops to get more done each day after work, even if I can only spend an hour or half our on the house. So by Friday of this week, I wrapped more felt paper around the north and east walls. Then I added water proofing material to the remaining south wall window sills.
Subscribe to:
Posts (Atom)










