Today I cut the opening for the French doors in the west wall. Of course, it took longer than I thought. Then I got the OSB panels up for the north wall before it got really dark. I still have to fully screw down the panels to the studs and cut out two window openings. Thanks to day light savings time, the sun sets earlier now, so I will have virtually no sun light to work on the playhouse after work.
Sunday, November 6, 2011
Saturday, November 5, 2011
Playhouse West Wall
Today I had just enough time to mount the plywood for the west wall before the rain set in. I still have to cut out the big opening for the French doors.
Monday, October 31, 2011
The East Wall
I finally put up the OSB plywood on the east wall of the playhouse, and it really helps make the structure more stable and rigid. I feel much more confident about my design and construction work now! Of course I still have a lot more plywood panels to put up, but I won't be able to do it until after the next forecasted rain fall this coming Thursday.
Thursday, October 20, 2011
Dormer Modification
So I think the dormer roof looks better than the flat top roof. I extended the dormer roof gable out to the east wall to make it simpler to build. Before I modeled the change in my CAD, I thought it might look weird, but it looks acceptable.
Monday, October 17, 2011
Simpler Dormer Roof
Here's an idea I am considering for a simpler dormer roof to make it easier for me to build.
Simple ...
More difficult ...
Simple ...
More difficult ...
Sunday, October 16, 2011
Playhouse Dormer Roof
I've been delinquent designing the framing for the dormer roof I want to put over the loft level, so here is my first stab at it. I will need to refine this further, because some 2x4's are not lining up very well.